Solutions
Program Management
Led the team responsible for consolidation of lab spaces at Sun Microsystems, consolidating 500,000 square feet of lab space in 9 buildings into 150,000 square feet in 1 building. Consolidated space included high-density tape libraries and equipment racks requiring redesign of chiller plant and distribution systems.
In addition, redesign of infrastructure, fire suppression, badge access, EPO and other physical security systems was required. Spaces included a Data Center, Customer Briefing Center, customer-facing learning classrooms, disaster recovery and light manufacturing.